Deck waterproofing system

Intelligent waterproofing leader - focus on technology, humanities and environmental protection to promote the development of waterproofing industry

Deck waterproofing system

Decks are exposed and are susceptible to erosion from outside conditions that can cause damage to the deck. If it is raining and snowing, there may be water leakage to the downstairs, therefore, the deck waterproofing is very necessary. In order to solve the problem of water leakage from the terrace, WeiYiJia has carried out research work on the causes of water leakage from the terrace and the treatment and repair methods, and is now launching the golden system of terrace waterproofing, which covers WYJ-313 transparent Tendon polyurea waterproofing material/WYJ-314 smash-free brick structure plugging repair/WYJ-315 smash-free brick structure settlement repair, which can effectively prevent leakage and re-leakage from the terrace.

Products - Construction - Safety
Terrace
Fab

WYJ-313: Transparent and will not destroy the decorative effect of the original various base walls after coating.

WYJ-314: The product is insoluble in water, water-repellent and strong in penetration.

WYJ-315: Through the two-component reaction of A and B, a colloid is generated to fill the voids in the structure.

Work

WYJ-313: no yellowing, high and low temperature resistance, non-toxic, environmental protection, water resistance, wear resistance, fast construction, no smashing tiles, wide range of use.

WYJ-314: simple construction, no need to smash the floor tiles can be reconstructed waterproof layer, waterproof life, environmental protection and pollution-free.

WYJ-315: low viscosity before curing, simple construction, adjustable curing time.

Safe

All products meet the requirements of safety and environmental protection.

Scope of application
Terrace waterproofing renovation

- exposed terrace balcony / indoor balcony waterproofing renovation and leak repair

使用位置
Construction scene map
Construction
Construction
Construction
Construction
Construction
Construction
Cautions
1

Precise proportioning, mixing and stirring evenly.

2

In the process of product construction, wear protective gear (protective glasses, work clothes, gloves, rain shoes, etc.).

3

If accidentally splashed in the eyes or accidentally taken, use a lot of water to rinse, and then seek medical attention.

Construction conditions
01

LV-313 should not be exposed to open water within 3 hours after construction.

02

The B component of LV-314 is insoluble in water and precipitation is normal.

03

The powdered material of component B of LV-314 is the curing agent in the product system, and the more the amount added the shorter the curing time.

04

LV-315 is a concentrated solution with a white precipitate below the component A material.

05

According to the construction needs, the data of LV-315 setting time can be referred to.

Case Studies
GUOJIAN
LINKS: 百度
E-mail:guojianjingcai@126.com AD:B20, International Software Park, Hunnan District, Shenyang 版权所有 © 国建精材 | Copyright 2021 All Rights Reserved 辽ICP备00000000
by design:seqill.cn
官方微信二维码
官方抖音二维码