Bathroom waterproofing system

Intelligent waterproofing leader - focus on technology, humanities and environmental protection to promote the development of waterproofing industry

Bathroom waterproofing system

Due to the frequent use of water in the bathroom, the problem of water seepage is more common, which directly affects the normal use of the building. Water seepage in the bathroom has become one of the common problems of current engineering quality problems. The system covers three products, WYJ-313 Transparent Tendon Polyurea Waterproofing Material/WYJ-314 Smash Free Tile Structure Leakage Repair/WYJ-315 Smash Free Tile Structure Settlement Repair, which can effectively prevent the bathroom from leaking and releasing.

Products - Construction - Safety
Restrooms
Fab

WYJ-313: Transparent and will not destroy the decorative effect of the original various base walls after coating.

WYJ-314: The product is insoluble in water, water-repellent and strong in penetration.

WYJ-315: Through the two-component reaction of A and B, a colloid is generated to fill the voids in the structure.


Work

WYJ-313: no yellowing, high and low temperature resistance, non-toxic, environmental protection, water resistance, wear resistance, fast construction, no smashing tiles, wide range of use.

WYJ-314: simple construction, no need to smash the floor tiles can be reconstructed waterproof layer, waterproof life, environmental protection and pollution-free.

WYJ-315: low viscosity before curing, simple construction, adjustable curing time.


Safe

All products meet the requirements of safety and environmental protection.

Scope of application
Leakage plugging in bathroom

- Leakage in bathroom/leakage repair treatment in sunken bathroom

使用位置
Construction scene map
Construction
Construction
Construction
Construction
Construction
Construction
Leakage causes
1

The structure construction process of maintenance, pounding is not in place, so that there are cracks and uncompacted places in the concrete structure, and leakage will occur when water is encountered.

2

The bathroom caisson part is installed with fine wire fixed on the bottom mold of the plate, and after the concrete is poured, water seepage is caused by the uncompactness between the fine wire and concrete and the rusting of the fine wire.

3

Premature stacking of the slab part and excessive stacking caused local weak position cracking, forming a potential leakage problem.

Caution
01

LV-313 should not be exposed to open water within 3 hours after construction.

02

The B component of LV-314 is insoluble in water and precipitation is normal.

03

The powdered material of component B of LV-314 is the curing agent in the product system, and the more the amount added the shorter the curing time.

04

LV-315 is a concentrated solution with a white precipitate below the component A material.

05

According to the construction needs, the data of LV-315 setting time can be referred to.