Forming non-curing rubber asphalt waterproof coating

A special coating with a core of special additives that can fully extract various active ingredients from waste rubber and make a chemical bond between various polymers, which is always viscous.

Forming non-curing

It is a special coating with a core of special additives that can fully extract various active ingredients from waste rubber and make a chemical bond between various polymers, and the coating is always in a viscous state.

Products - Construction - Safety
Forming
Fab

Products never curing, forming a seamless, continuous waterproof membrane, no overlap leakage potential.

products cohesive destruction, strong adhesion, effective resistance to building settlement and cracking.

The product has a certain creeping nature and can make up for small gaps by itself.


Work

The daily construction volume of 3 persons/group is around 800㎡.

Construction is little affected by human factors.

Construction temperature can be as low as -40°, and snow does not affect construction.


Safe

No heating, safe construction, green.

Scope of application
Engineering Waterproofing

—Waterproofing outside underground structures, such as subways, underground integrated corridors, building basements, etc.; roof waterproofing, such as industrial plants, concrete flat roofs, color steel roofs, slate tiles, bunker trenches, etc.; artificial water lakes, pools, swimming pools, waste treatment plants, sinkholes, golf course water ponds, etc.; underground passages, waterproofing and anti-corrosion inside and outside waste water treatment plants; bridge deck waterproofing.

使用位置
Construction scene map
Construction
Construction
Construction
Construction
Construction
Construction
Construction conditions
1

Base surface reinforcement - additional layer treatment of yin and Yang corners - additional layer treatment of pipe roots - large surface construction - inspection and repair

2

Automatic healing of splicing lap joints; no fire baking, high bonding; safe and environmentally friendly.

3

Ability to resist displacement and settlement; can be constructed in all seasons.

Cautions
01

The material must be placed in a cool place, no exposure to the sun, the product cold construction, no need to heat, after tearing the film can be used.

02

Construction time 6:00 am to 10:00 am, 15:00 pm to 20:00 pm is better Construction time, after bonding with the sunlight, the natural gel chain reaction, and the grass-roots natural full adhesion.

03

Requirement that the grass-roots level must be swept with a hair dryer and coated with a grass-roots treatment SBS primer. Cannot be applied in rainy weather or with rain within 12 hours.

04

Avoid sun and rain, store under dry and ventilated environment, storage period is one year from the production date.

Case Studies
GUOJIAN
LINKS: 百度
E-mail:guojianjingcai@126.com AD:B20, International Software Park, Hunnan District, Shenyang 版权所有 © 国建精材 | Copyright 2021 All Rights Reserved 辽ICP备00000000
by design:seqill.cn
官方微信二维码
官方抖音二维码